Author Topic: scheduler shut down.  (Read 868 times)

Offline sirloinofbeef001

  • Sr. Member
  • ****
  • Join Date: Oct 2013
  • Location:
  • Posts: 457
  • Kudos: 0
  • believe in miracles
scheduler shut down.
« on: October 22, 2013, 06:21:57 AM »
I was running the scheduler in series of 1 hour increments and the show quit outputting signal. I wanted to post it on light show pro site but I already seen where me Christmas has already done that. Just be sure if you are using lsp to bench it in series to be sure. I did the same series each time while benching. Just wanted to let you know. I hope I don't have any issues.
Its a wonderful life.

Offline zwiller

  • Falcon Beta Team
  • **
  • Join Date: Mar 2013
  • Location: Sandusky, OH
  • Posts: 938
  • Kudos: 12
Re: scheduler shut down.
« Reply #1 on: October 22, 2013, 01:44:17 PM »
I used the last 32bit release of LSP last year and used the scheduler with success.  All the 64bit releases are problematic for me whether sequencer or scheduler.  Planning on using the conductor to run my show this year but it is very tempting to go the PI player and etd route since I now have an excuse to buy a raspberry pi.  That said, I don't have a clue how to use it and have a ton things to accomplish and no extra time to fool with new gear.   
Sam

Last year's video: https://vimeo.com/150560653

Offline sirloinofbeef001

  • Sr. Member
  • ****
  • Join Date: Oct 2013
  • Location:
  • Posts: 457
  • Kudos: 0
  • believe in miracles
Re: scheduler shut down.
« Reply #2 on: October 22, 2013, 01:49:31 PM »
I'm definitely using the pi.

 

Back to top