Author Topic: Isolate days in run schedule possible?  (Read 67 times)

Offline cfpsystems

  • Newbie
  • *
  • Join Date: Sep 2017
  • Location:
  • Posts: 6
  • Kudos: 0
Isolate days in run schedule possible?
« on: December 02, 2017, 06:50:16 AM »
Howdy,

Is it possible to have a schedule (I have two, one for Sun-Thurs and a different run time for Fri/Sat), but I would like the lights to stay on longer on Christmas and New Years Eve. Can I just put those two dates in and they would override what is there, or do I need to do all the days "up to" 12/24, then resume to what I had, then "up to" 12/31, then resume again?

Thanks,
Charlie-

Online CaptainMurdoch

  • Administrator
  • *****
  • Join Date: Sep 2013
  • Location: Washington
  • Posts: 8,268
  • Kudos: 151
Re: Isolate days in run schedule possible?
« Reply #1 on: December 02, 2017, 11:00:41 AM »
You have to have separate before, after, during schedules.  I have mine setup the same way.  When I revisit reworking the scheduler code I want to allow more specific schedules overriding less specific ones but the current code doesn't work that way.
-
Chris

Offline cfpsystems

  • Newbie
  • *
  • Join Date: Sep 2017
  • Location:
  • Posts: 6
  • Kudos: 0
Re: Isolate days in run schedule possible?
« Reply #2 on: December 03, 2017, 02:49:33 PM »
Thank you Chris. I figured as much but wasn't sure.

 