News:

LATEST RELEASE:  FPP 8.4 - Download from here - https://github.com/FalconChristmas/fpp/releases/tag/8.4

+-+-

+-User

Welcome, Guest.
Please login or register.
 
 
 
Forgot your password?

+-Site Stats

Members
Total Members: 16873
Latest: jameman12
New This Month: 12
New This Week: 1
New Today: 1
Stats
Total Posts: 135403
Total Topics: 16970
Most Online Today: 139
Most Online Ever: 7634
(January 21, 2020, 02:14:03 AM)
Users Online
Members: 0
Guests: 103
Total: 103

K8-Pi Cape Power

Started by VistaLeaf, May 21, 2023, 07:50:59 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

VistaLeaf

I have a few questions about powering a K8-Pi cape separately from the Pi 3 B+.

The Pi will have its own power supply and be powered at all times. I would like to put the power supply (and thus the cape too) on a smart switch.

Question 1: will applying power to the cape when the Pi is already booted cause any problems?
Question 2: will removing power from the cape while it is attached to the Pi cause any problems?

I'll have schedules that mesh with the smart switch so power isn't added or removed while a playlist is running.

I'll be using this system year-round for permanent lights and I don't want the power supply running 24/7.

k6ccc

Quote from: VistaLeaf on May 21, 2023, 07:50:59 AMI'll be using this system year-round for permanent lights and I don't want the power supply running 24/7.

Can't help you on the separate power issue, but my standard question is why?  The total power consumption is miniscule, and electronics generally fail at power up.  Leave them running and in most cases, they will be happier.  The exception to that may be if heat is going to be a problem during the day.

BTW, I have run year round landscape lighting since 2011 and currently have two LOR AC controllers, three LOR DC controllers, a Falcon F4v3, and a Falcon Smart Receiver board that run 24 x 7 x 365.  The only thing that is not run during the off season is the dedicated show computer.  From early January until mid October, the landscape lighting is controlled by my domain controller / file server since it will be running year round anyway.  For Halloween & Christmas, I do have a dedicated show computer.
Using LOR (mostly SuperStar) for all sequencing - using FPP only to drive P5 and P10 panels.
My show website:  http://newburghlights.org

Jim

dkulp

As long as you REMOVE the "Power the Pi" jumper, then the power for the pixel connectors is completely separate from the power to the rest of the cape.   The grounds are tied, but the V+ is completely separate.  Thus, you can power the two up/down individually. 
Daniel Kulp - https://kulplights.com

VistaLeaf

Quote from: dkulp on May 21, 2023, 02:03:33 PMAs long as you REMOVE the "Power the Pi" jumper, then the power for the pixel connectors is completely separate from the power to the rest of the cape.  The grounds are tied, but the V+ is completely separate.  Thus, you can power the two up/down individually.

Thanks for your reply. This is very good news.

VistaLeaf

Quote from: k6ccc on May 21, 2023, 10:20:01 AMbut my standard question is why?  The total power consumption is miniscule, and electronics generally fail at power up.  Leave them running and in most cases, they will be happier.  The exception to that may be if heat is going to be a problem during the day.
Yes, I think heat will be an issue for me here in Georgia. The box will be tucked away from direct sunlight but I still worry about heat build up.

Also, running equipment for 24 hours when it's only doing something useful for 4 of those hours is wasteful (both money and electricity). Who knows, I may change my mind on all this and go with the simpler solution. Testing is part of the fun.

Support FPP

+- Recent Topics

Scoreboard Plugin by CaptainMurdoch
February 06, 2025, 04:34:30 PM

K32 only the pixels stopped outputting by tetleytealeaf
February 06, 2025, 02:03:40 PM

Power failure wreaked havoc by perigalacticon
February 05, 2025, 04:04:27 AM

What is the fanout capabilities of ws2811 controllers? by k6ccc
February 04, 2025, 05:53:10 PM

SPixels broken in version 6 and upwards by dkulp
February 04, 2025, 02:52:30 PM

FPP stopped working by crookedpriority
February 03, 2025, 10:45:17 AM

Setting up a wired on demand show on Pi/ FPP to push a show to Falcon Controller by breese
February 03, 2025, 04:54:44 AM

F16V4 Expansion Board Half of the board stop lighting up. by onlineshopper
February 03, 2025, 03:08:47 AM

Overlay Matrix: write more than one pixel at a time ? by niemy
February 02, 2025, 03:35:16 PM

FPP Spixels bug by Colg
January 31, 2025, 02:52:05 PM

Powered by EzPortal
Powered by SMFPacks Menu Editor Mod